P-031-2022-Smt. Mini Felix, Ernakulamn-Order 25-07-2022
The appellant installed a grid connected solar system on getting the approval from the Licensee by an approved service provider. On 25-10-2021, the Licensee demanded for Rs.3,540/- as connecting charge and the same has been paid and the solar plant identification number was allotted by KSEBL. The application for meter testing & inspection was submitted on 01-11-2021. The testing was done on 15-12-2021 and solar plant was connected to the grid. As per the appellant, there was a delay of 44 days from the date of application and hence, suffered loss of energy. Appellant’s request is to compensate the loss. The appellant filed a petition before CGRF, Central Region and the Forum dismissed the petition. Aggrieved by the decision of the Forum, the appellant filed the appeal petition and this Authority decides as follow. (14) The Licensee has to reimburse the energy charges for 22 days (from 23-11-2021 to 15-12-2021) collected from the appellant. (15) The order of CGRF, Central Region in OP No.74/2021-22 dated 23-03-2022 is set aside.

Data

Size 141.09 KB
Downloads 348
Created 2022-08-24 11:13:58

Download