P/104/2015 Sri Abdul Azeez P.T., Mavoor P.O, Kozhikode
The appellant Sri Abdul Azeez P.T. is a consumer under Electrical Section, Mavoor with consumer No. 5603. The appellant owned a building having 3 shop rooms at Mavoor, Parammal which is located three meter away from Mavoor-Kozhikode main road. The appellant alleged that the proposed transformer to be shifted is situated at about 100 metres away from his premises. The proposed location is in front of the appellant’s shops thereby obstructing the way to the stair case of his building. The appellant approached the CGRF with a complaint seeking immediate steps to prevent the shifting of transformer by the respondent so as to avoid further hindrance to appellant’s buildings. But the Forum found that the structure for installing the transformer has been erected in such a way that there was no obstruction to movement of men and material and general public thus ratifying the action of the respondent. Against the order of the Forum, the appellant filed this petition before this Authority. The respondent is directed to shift the location of the transformer as suggested by the Enquiry Officer and to install a new transformer. Appeal is admitted. CGRF order set aside.

Data

Size 149.76 KB
Downloads 1210
Created 2015-08-19 00:00:00

Download