Downloads
Overview Search Downloads Submit file Up
Download details
P/151/2015 Smt. Tessy K Mathews Kottayam.
The appellant, Smt. Tessy K Mathews is a consumer with consumer No. 7899 under Electrical Section, Poonjar, who has availed a single phase connection on 19-04-2014 under LT VII A tariff for the construction purpose and later the tariff was re-categorised under LT VI F. On 15-11-2014, the appellant had applied for tariff change to I A domestic category. On receipt of the application, the Assistant Engineer, Electrical Section, Poonjar inspected the appellant’s premises and requested to rectify the anomalies already noticed. It is alleged that the respondent has not regularized the service connection availed for construction purpose and proceeded against the appellant under Section 138 of Electricity Act, 2003 by issuing a notice dated 09-01-2015 for unauthorised shifting of the meter under non standard conditions flouting safety norms. Aggrieved by this, the appellant approached the CGRF, (South) Kottarakkara by filing a Complaint No. 1356/2014. The Forum disposed the petition vide order dated 27-05-2015 with the following directions. 1. The petitioner shall arrange the suitable & safety place for fixing the meter box. 2. The respondent shall take necessary actions to change the tariff with immediate effect after fixing the meter box in the safe place after collecting the required charges for the necessary works. Aggrieved against the above decisions of Forum, the appellant has approached this Authority with this appeal. Regulation 22(d) of KSERC (CGRF & Electricity Ombudsman) restricts the maintainability of petition filed for the same cause of action and relief, the appeal filed by the appellant needs no further action at this end and accordingly stands dismissed.

Data

Size 312.41 KB
Downloads 1232
Created 2015-12-30 00:00:00

Download