P/182/2015 The Assistant Vice President Administration, HDFC Bank Ltd., Kottayam.
The appellant is a LT 3 phase consumer with consumer No. 5581 under Electrical Section, Kottayam East. The sanctioned load of the appellant is 69 kW and the tariff allotted is LT VI C. On 27-05-2015 the APTS, Kottayam unit conducted an inspection in the appellant’s premises and detected that the first and second phases i.e. R and Y phases are connected with CT having ratio 200/5 and the third phase i.e. B phase with 100/5 and the assessment was being done with multiplication factor as 20. Based on the site mahazar prepared by the APTS team, a demand notice dated 10-09-2015 for an amount of Rs. 3,13,880.00 was issued for the wrong application of multiplication factor. Aggrieved against this, the appellant approached CGRF (South), Kottarakkara and filed OP No. 1589/2015. The Forum disposed the petition by upholding the above demand. Still aggrieved the appellant filed this appeal before this Authority. In view of the above facts it is hereby ordered that the appellant shall be reassessed as per his average consumption for a period of 3 months after rectifying the defects for the period from 07-06-2014 to 27-05-2015 i.e., the period of wrong application of multiplication factor. This should be done at any rate within a period of 30 days from the date of receipt of this order. No interest or surcharge need be levied during appeal pending period and up to the date of revised bill ordered now. The appellant may be allowed suitable installments if requested for. Having concluded and decided as above it is ordered accordingly. The appeal petition filed by the appellant is found having some merits and is allowed to the extent as ordered. The related order of CGRF in OP No 1589/2015 is set aside. No order as to costs.

Data

Size 147.04 KB
Downloads 1171
Created 2016-04-18 00:00:00

Download