Downloads
Overview Search Downloads Submit file Up
Download details
P/036/2016 Sri. Greenol K.B., Thrissur 680564.
M/s Atlas Gold Township Private Limited is having HT service connection with consumer code: 8/7135 under the jurisdiction of Electrical Section, Kalady, with a contract demand of 250 kVA and connected load of 1470 kW. Since the building is a multipurpose township, the tariff allotted was HT-IV commercial tariff. In the ground floor of the building there is reception area, parking area and above the ground floor there are 7 floors consisting 208 flats. At the ground floor there is an electrical room where 2 Nos. of transformers having a capacity of 750 kVA. Supply from this transformer has been extended through the distribution boxes to the panels installed at various floors of the building. The appellant, Sri Greenol K.B, is the owner of flat No. 226 in the Atlas Celestial Park associated with Atlas Gold Township Pvt. Ltd., who has applied for a service connection under LT domestic tariff to his flat. But the respondent has denied the request and directed the appellant to submit scheme approval from the Electrical Inspectorate. Aggrieved against this, the appellant filed a petition before the CGRF, Ernakulam seeking remedy to his grievances. The Forum in its order dated 03-05-2016, disposed of the petition directing the respondents to effect the service connection to the appellant’s flat with immediate effect as per Regulation 56 of Electricity Supply Code, 2014, which deals with the methods to be adopted for giving single point supply and sharing of electricity charges in multi-storied building. Hence the licensee (respondent) is directed to comply with the provisions of the said Regulation particularly 56(2), (4), (6) and (9) and to give service connection.” Not satisfied with the above decision of CGRF, the appellant has submitted this appeal petition before this Authority. In the above circumstances the respondent is directed to provide separate service connection to the appellant’s flat under domestic tariff without any delay after complying with the directions issued by Hon’ble High Court in its common judgment in Writ Petitions (C) 27140/2015 and 6548/2016. The order No CGRF-CR/Comp/151/2015-16 dated 03-05-2016 is modified to the extent as ordered above. No order as to cost.

Data

Size 220.92 KB
Downloads 1098
Created 2016-11-10 00:00:00

Download