P/134/2017 - Sri. K.M. Abdulkhader
The APTS Unit of Kozhikode conducted an inspection in the premises on 19-04-2017 and found that the 'R' phase and 'Y' phase voltage terminals were seen connected interchanged. Accordingly, the appellant was served with a provisional short assessment bill, assessing for a period of 24 months, when the meter was found recording less than the actual, so as to recover the unrecorded portion of energy, for Rs. 400606/-. The respondent is directed to revise the bills for the consumption for the period of 24 months prior to the inspection by taking an average consumption for the months of 05/2017, 06/2017 and 07/2017, i.e 3041 units.