P/012/2018 - Sri. George Joseph, Kottayam
The appellant has filed the appeal petition, being aggrieved at the inaction of KSEB to shift the electric line passing through his property to the road side, situated under Electrical Section, Ponkunnam. Though the appellant had approached the KSEB for shifting the 11 kV line, they had prepared estimate amounting to Rs. 90,371/‐ and later Rs. 73,597/- and demanded the appellant to remit the same. The appellant is aggrieved by the huge sum demanded by KSEB for the work, he has filed petition before the CGRF, Kottarakkara vide Petition No. OP No. 536/2017 and the CGRF has disposed it by order dated 02-02-2018, with the remarks as; “ the LT line can be shifted from the property of the petitioner and others based on the remittance of work deposit amount.”Still aggrieved by the said order, the Appellant has filed the Appeal Petition, before this Authority. From the analysis done and conclusions arrived at, I take the following decision. The respondent shall prepare a revised estimate for the deposit work amount comprising of the construction of the 180 metres of LT single phase 2 wire and labour charge of shifting of 100 metres (i.e., labour charges for the shifting of existing single phase line to the road and estimate cost for the additional single phase 2 wire line construction) and if the appellant is willing to remit the amount, the respondent shall carry out the work. The estimate cost can be shared with the two other beneficiaries by the appellant, if possible. The order of CGRF is modified to this extent. After completion of the work, the respondent shall prepare an evaluation statement of the work based on actual quantities. The appellant shall remit the excess cost if any, within one month, failing which the Licensee shall be entitled to recover the same, as if it was arrears of current charges under appropriate regulations. Excess remittances if any shall be refunded by the respondent by adjustment in the monthly current charges/direct refund within a period of 3 months. Having concluded and decided as above, it is ordered accordingly. The Appeal Petition filed by the appellant is found having merits and is allowed to the extent it is ordered.

Data

Size 269.79 KB
Downloads 1182
Created 2018-06-18 08:39:46

Download