Downloads
Overview Search Downloads Submit file Up
Download details
P/029/2018 Sri. Sadiq P.A. Ernakulam
The appellant representing the Jewel Riverwoods Flat Owners Association, Aluva approached the Electrical Section, Aluva North for shifting two numbers of electrical posts installed in the flat compound to the private road outside the compound for which the flat owners have 50% ownership. But this was objected by the other owners of the private road and the matter was presented before the Additional District Magistrate (ADM) by the respondent. The ADM dismissed the petition after hearing both parties as he found the petition lacks merits. Then the appellant approached the CGRF-CR, Ernakulam by filing a Petition vide No. 88/2017-18 and the CGRF directed the respondent to realign the post and line to the boundary of the property of the appellant after collecting the required charges, vide its order dated 31-03-2018. The respondent has prepared an estimate for shifting the PSC pole and realignment of three phase line on work deposit basis. The work was not done since the shifting will cause damage to the pipelines of the sewage treatment plant of the appellant. Aggrieved against this, the appellant has submitted the appeal petition before this Authority. From the analysis done and conclusions arrived at, I take the following decision. The respondent is directed to prepare an estimate for the drawing of the LT Aerial Bunched Cable (ABC) in the place of existing three phase four wire overhead conductor for two span of line within 15 days from the date of the order and inform the appellant. If the appellant is willing to accept the proposal and to bear the expenditure, the respondent shall carry out the work within one month without changing the location of the existing electric LT poles. The order of CGRF in OP No. 88/2017-18 dated 31-03-2018 is set aside. Having concluded and decided as above, it is ordered accordingly. No order as to costs.

Data

Size 219.36 KB
Downloads 1146
Created 2018-08-07 09:21:43

Download