Downloads
Overview Search Downloads Submit file Up
Download details
P-021-2022-Smt. Thahira, Kayamkulam-Order 20-06-2022
On 14-09-2021, the Anti-Power Theft Squad (APTS), Alappuzha team along with Sub Engineer of Licensee inspected the premises in the presence of the representative of the appellant and found that the ‘R’ phase of the meter was recording electricity below 29.7% of the actual consumption. A site mahazar was prepared in presence of the representative of the appellant. The appellant was issued a short assessment bill for Rs.96,147/- for the period from 03-07-2021 to 14-09-2021. The appellant challenged the bill before the CGRF, Central Region, Ernakulam and the Forum ordered to reassess the short assessment by revising the bills of 07/2021 and 08/2021 based on the average consumption computed from the three billing cycles after the replacement of the phase wire i.e., from 10/2021. The appellant filed the appeal petition to this Authority. Following decision is taken: (1) The appellant is liable to pay the bill as per short assessment arrived as per the decision of CGRF (Central Region), Ernakulam vide OP No. 53/2021-22 dated 03-03-2022.

Data

Size 160.59 KB
Downloads 388
Created 2022-07-11 11:51:51

Download