Downloads
Overview Search Downloads Submit file Up
Download details
P/060/2023- Shri. Varghese Kurian
The appellant Sri. Varghese Kurian is a HT consumer of the licensee. HTconnection has been availed from the licensee to run an industrial unit. On 07/11/2022, the consumer had intimated AE, Electrical Section, Thodupuzha that their CT/PT unit is damaged and hence requested unmetered power supply. The agreement signatory sanctioned direct supply for 15 days and directed then to replace the faulty meter within this time. In the letter it was also stated that the penalty as per the Regulation will be imposed if they fail to replace the faulty meter within this time. The consumer did not change the meter within the stipulated time limit, penalty for meter fault for Rs. 5,74,982/- was charged with the demand during March 2023. The extra amount due to the delay in replacement of the defective meter was charged as per the General Condition 4(d) of the tariff order. The appellant has contented the extra charging on this issue and filed petition to CGRF (Central Region). The CGRF issued order dated 30/09/2022 stating that the appellant is liable to pay the penalty imposed by the respondent. Aggrieved by the decision of CGRF, this appeal petition is filed to this authority.

Data

Size 130.72 KB
Downloads 373
Created 2024-02-09 05:39:20

Download