Downloads
Overview Search Downloads Submit file Up
Download details
P/046/2024, Shri. Biji Sony
The appellant Shri. Biji Sony is an industrial consumer of the licensee (KSEBL) under their electrical section Ramapuram which is under electrical sub division, Ramapuram. The service connection was with consumer no: 1156292019111 in LT IV AH tariff affected on 08/08/20216. The LT 3 phase connection was with contract demand 93 KvA and connected load 83 Kw. The 3 phase CT meter was connected for this consumer on 02/12/2019 with CT ratio 200/5 and accordingly the multiplication factor was 40. APTS had conducted an inspection on 11/12/2023 at this premises and found that the current in R phase of meter is recording as zero though there was current in the R phase on testing with long tester. The correctness of the meter was tested with a calibrated meter and found that the existing meter is recording 29.75% less than the actual consumption. A short assessment bill for Rs. 68,261/- was issued for a period of one year from 01/2023 to 12/2023. The APTS informed that the R Phase CT was damaged on 28/09/2019. Then the meter and CT were tested in TMR lab of the licensee.Then the short assessment bill was revised for Rs. 2,42,684/- for a period for 12/2019 to 12/2023. The appellant has contented the demand and filed petition to CGRF, CGRF issued order dated 11/06/2024. Aggrieved with the decision of the order of CGRF, this appeal petition was filed.

Data

Size 214.5 KB
Downloads 680
Created 2024-10-03 09:35:06

Download