A three phase LT service connection bearing Consumer No. 1146179025563 has been given to Stephen Chacko, Pandiyalil Thiruvalla on 30/03/2019. The connected load was 53.38 KW and the purpose was for functioning of Regional Office of the State Bank of India. And the tariff was LT VIC. The occupant of the premises is the Regional Manager of SBI and the consumer has authorise the occupant to file the petition and connected proceedings. The metering was done by a CT connected meter with CT ratio 100/5. On 21/12/2023, a surprise inspection was conducted by APTS along with the officials of the electrical section and found that current in the Y phase was not recorded by the meter. Then the consumption recorded by the meter was 1/3rd less than the actual consumption. The short assessment bill for Rs.4,60,378/- has been prepared and the same is demanded from the appellant for a period from 06/2021 to 12/2023 which is for 31 months. This has been contented by the appellant and filed petition to CGRF. CGRF had issued order on 08/11/2024 on completing the procedures. Aggrieved with the order, this petition is filed as an appeal petition to the CGRF order. |
|
Data
|
Size |
235.92 KB |
Downloads |
15 |
Created |
2025-03-10 07:21:58 |

|
|