Downloads
Overview Search Downloads Submit file Up
Download details
P/029/2025, Sri. Vinod.S.Panicker
The appellant Shri. Vinod.S.Panicker had availed a 3 phase LT connection for his bake house o 10/09/1996 from the Licensee(KSEBL). The connected load of the connection is 20.24 KW under LT IVA tariff. APTs, Thiruvananthapuram had conducted an inspection along with the officials of the Electrical Section, Contonment on 06/07/2024. They have noticed an anomally in the metering system that one CT was out of the measuring circuit which lead to an error in the measurement. The APTs has assessed the reduction in reading with a standard, calibrated meter which was around 35.61%. Accordingly a short assessment bill was prepared for 26 months from 01/06/2022 to 06/07/2024 for Rs.2,78,044/- and send to the consumer demanding the payment.The appellant had contented this demand and filed petition to CGRF. CGRF on completing the procedural formalities have issued order on 07/03/2025. Aggrieved by the decision of CGRF, this appeal petition have been filed to this Authority.

Data

Size 197.85 KB
Downloads 12
Created 2025-08-05 07:09:51

Download