Downloads
Overview Search Downloads Submit file Up
Category: Orders
Order by: Default | Name | Date | Hits | [Descending]
Orders Files: 1346
Orders of Kerala Electricity Ombudsman  in pdf format
Files:
Meter faultiness and issuance of back assessment bill to the consumer – P/358/2013 – Sudhikumar S, Thiruvanathapuram.

Download 
Download

The electric meter installed in the premises of the domestic consumer was found faulty and the party was issued with a back assessment for the meter faulty period. It is held that the consumer is bound to pay the charges for electricity he has consumed and ordered to reassess the back arrears for a period of one year prior to meter change based on the average 6 months consumption after replacing the faulty meter.
3. Unauthorized additional load and issuance of short assessment bill being the arrears of penalization charges – P/362/2013 – Saseendran S, Aluva.

Download 
Download

The consumer has availed unauthorized additional load and remitted the penal bill issued by the Board. Further the consumer was issued a short assessment bill as arrears of penalization charges for the said UAL. Disposed with direction to limit the penalization for one year in continuation of the date of inspection.
3. Unauthorized additional load and issuance of short assessment bill being the arrears of penalization charges – P/362/2013 – Saseendran S, Aluva.

Download 
Download

The consumer has availed unauthorized additional load and remitted the penal bill issued by the Board. Further the consumer was issued a short assessment bill as arrears of penalization charges for the said UAL. Disposed with direction to limit the penalization for one year in continuation of the date of inspection.