Downloads
Overview Search Downloads Submit file Up
Category: Orders
Order by: Default | Name | Date | Hits | [Descending]
Orders Files: 1327
Orders of Kerala Electricity Ombudsman  in pdf format
Files:
P/111/2015 - Sri. I Martin Jeevaraj, Idukki

Download 
Download

The licensee, KSE Board Limited has drawn LT lines to give power supply to Poonjar Drinking Water Scheme under Electrical Section, Peermade, a project sponsored by the District Panchayath. KSEBL has erected posts along the side of the public rood, and two posts are standing in the property of Smt. Vanaja whose boundary is marked by barbed wire fencing. The appellant is disputing the erection of posts stating that the posts are erected in the middle of the road and also encroachment of the Purambokku road. Aggrieved by this, the appellant approached the CGRF with a plea to shift the posts to the side of the path. As the issue relates to revenue matters and Forum has no jurisdiction, the complaint was disposed vide order no. 118/14-15 dated 25-02-15. Not satisfied with the decision of the CGRF, the appellant filed an appeal petition before this Authority. Since the appellant had already approached the Revenue Authorities for settling the disputes it is not proper for this Authority to make any orders in this regard.
P/110/2015 - Sri. Santhosh Kumar S, Kollam

Download 
Download

The appellant is a consumer having Consumer No. 11827 of Electrical Section, Kundara, under LT IV tariff. He is running an SSI Unit namely Pooja Food Industries established in 1995 engaged in production of baker/confectionary items. On 23-08-2014 APTS Palakkad Unit conducted a surprise inspection at the above premises of the appellant and it was found a defect in the functioning of the meter resulting short recording due to fluctuation of voltage in the B phase. A site mahazar is prepared and on the basis of this, a short assessment bill for Rs.1,08,001/- was issued on 28-08- 2014. Aggrieved by this, the appellant approached the CGRF, Kottarakkara with a petition in OP No. 1312/2014 which was not allowed. Still aggrieved by the above Order, the appellant prefers this appeal. Short assessment bill issued by the respondent for an amount of Rs. 1,08,001.00 is found in order. Appellant is directed to remit the amount in 5 installments without any interest. Appeal is disposed with the above direction. CGRF order is affirmed.
P/109/2015 - Sri. Biju T. Nair,Indus Towers, Cochin

Download 
Download

The appellant is a consumer having a three phase connection with consumer no. 13991 under Electrical Section, Mathilakam under VII A tariff. On 01-08-2014, the APTS team of KSEB conducted an inspection in the premises of the appellant and it was found that one phase of the metering equipment was missing due to the internal damage of the meter. On 04-08-2014, the appellant was issued with a short assessment bill amounting to Rs. 186986/- as the meter faulty period from 2/2013 to 06/2014. Aggrieved by this, the appellant approached the CGRF, Ernakulam by filing a Complaint No. 138/2014-15. The CGRF dismissed the petition and held that the short assessment bill dated 04/08/2014 for Rs. 1,86,986/- is in order, vide order dated 27-03- 2015. Still aggrieved with the above decisions of CGRF the appellant has approached this Authority with this appeal petition on 04/05/2015. The short assessment bill issued for Rs. 1,86,986.00 is found in order and the appellant is directed to remit the same without any interest. Appeal is dismissed. CGRF order is affirmed.