The appellant having a connected load of 20 kilowatts and a contract demand of 22.222 kVA in ToD billing. The electric connection was availed for running a cashew factory and the tariff allotted is LT IVA. The appellant received monthly electricity bill for the consumption in January 2020 for Rs.15,867/- plus Rs.54/- towards the surcharge for the delay in remitting the previous bill. The appellant challenged the bill in CGRF, Kottarakkara vide OP No.22/2020, but the Forum dismissed the petition, observing no abnormality in the bill and the consumption recorded in the meter is actual. Aappellant filed appeal petition on 03-12-2020. From the analysis done and the conclusions arrived at, the appeal petition No. P040/2020 filed by the appellant stands dismissed as it is found having no merits. The order dated 07-09-2020 in OP No. 22/2020 of CGRF, Kottarakkara is upheld. No interest or surcharge shall be collected from the appellant for the appeal period and the period of petition pending before CGRF. |
|
Data
|
Size |
173.31 KB |
Downloads |
1178 |
Created |
2021-03-08 08:55:18 |

|
|