The Uppala Traction Substation bearing consumer number 30/8392 is getting power through 110 kV feeder from Kubanoor Substation of the Licensee. On 31-03-2022 at 21.22 hours, the power was disrupted and same was restored only at 10-03 hrs. on 01-04-2022. The disruption of power created major difficulties and the Licensee only responsible for the same. The appellant claiming a compensation of Rs.50.0 lakhs for the loss and damage of reputation suffered by Railways. The appellant filed the petition to CGRF and CGRF-NR disposed the petition ‘ex-party’. The appellant filed the appeal petition to this Authority and decision is taken as follows:
(5) The Licensee very well coordinate with the consumer to avoid disturbance of the public utility services.
(6) The compensation asked is disallowed.
(7) The appeal is disposed. |
|