The appellant is a domestic consumer under Electrical Section Muthuvara, Thrissur with connected load 4.633 kW. The appellant installed a Grid interactive solar panel with capacity 3 kW on 25/06/2021. Then the billing have been changed from bi- monthly to monthly. The net metering has been introduced which used to record import as well as export of power. The appellant’s one allegation is about doubling of fixed charge which is not correct. On October 2022 it is found the reading taken from the net meter was inter changed. The export was recorded as import and import was recorded as export while taking the meter reading. Accordingly a short assessment bill was prepared and served to the appellant for Rs. 13,606/-. The appellant have contented the demand and filed petition to the CGRF Central Zone. CGRF issued order dated 23/06/2023 stating that the appellant is liable to pay the short assessment bill. Aggrieved by the decision of CGRF, this appeal petition is filed to this authority.

Data

Size 248.26 KB
Downloads 253
Created 2023-12-26 07:10:32

Download