Two phases of the CT to the meter faulty. Assessment of lost energy. P/188/2011-Alathur Grama Panchayath.
The Y-phase and B-phase CT’s, feeding the current input to the Meter is found not working on APTS inspection.Hence the meter is recording only 1/3 of the actual consumption. KSEB reassessed for the back period. Dispute the Bill raised.