Downloads
Overview Search Downloads Submit file Up
Download details
Unauthorised use of electricity – P/189/2011 – V.S.Jeevakumar, Ernakulam.
The dispute is regarding the unauthorised use of energy by the appellant by extending electric supply from one consumer number belonging to one building to the nearby building. The Assistant Engineer inspected the site and detected an unauthorised extension to the nearby building and a provisional bill under LT VIIA tariff was issued based on the inspection. This is the cause for the petition.

Data

Size 176.05 KB
Downloads 1999
Created 2012-07-16 09:55:23

Download