Delay to provide additional load demanded by consumer and detection of unauthorised additional load by KSEB squad – P/242/2011 – G. Ravindran Nair,Kochi
The consumer has applied to grant additional load to his institution. A demand notice served on the consumer directing to remit the estimated cost for the works like drawing of 11 KV line and installation of a new 100 KVA transformer. Meanwhile the KSEB squad detected unauthorised additional load penal bill and disconnected the supply.