The appellant is the owner of a High Rise building having a HT electric connection with a contract demand of 70 KVA. The connection was given after installing a 150 KVA indoor transformer. Seven numbers of other LT connections were also given to the said building (from KSEB T’rfr) on the basis of the applications of the owner/rent holders or occupants prior to HT service with in a total of 50 KVA. While so, the appellant had applied for additional load for a LT connection. Since the total load of all the LT connections so availed in the building including the additional load requested) exceeds 50 KVA, the appellant was asked to install a separate transformer in his building premises, by the KSEB. Hence this dispute. |
|