Downloads
Overview Search Downloads Submit file Up
Download details
Disconnection and dismantlement of an industrial electric connection –payment of arrear dues – P/194/2011 – Kunhamina C.K, Kannur.
The consumer who was running an industrial unit defaulted electricity charges due to loss and therefore the service was disconnected. Later the consumer’s power supply was restored based on Hon: High Court order. The consumer informed the Board that she is not in a position to run the industry due to mounting loss and requested to dismantle the supply. Even though supply was disconnected, it was not dismantled, due to filing of a case at Munsiff court. Thereafter the dismantling of connection was done and RR action initiated. What is the arrears of electricity charges actually payable. This was the cause for the petition.

Data

Size 131.75 KB
Downloads 2208
Created 2012-10-09 10:01:13

Download