The consumer had applied for additional load and regularized the same. The APTS inspection conducted just after the regularization of additional load, had detected an unauthorized extension and also unauthorized load in the premises of the consumer. The main point of dispute is whether the unauthorized load detected is one and the same that was regularized earlier. The petition was remanded to the Assistant Engineer to review the case and decide the issue afresh as per law. |
|