Downloads
Overview Search Downloads Submit file Up
Download details
Denial to grant power allocation to the applicant’s proposed new industrial firm alleging multiple service in a premise – P/396/2013 – K.P.Johny, Angamaly.
The appellant has applied for electric power to his new industrial unit and paid necessary fees for the same. The Asst. Engineer sought clarification from Dy. CE on the maintainability of giving electric connection for a new industry in a place, separated by a wall only, where there existed already 4 numbers of similar LT industrial connections that manufacture the same product, under the same ownership. The respondent declined to grant power as the DCE directed to advice the applicant to take a HT connection combining all units. Disposed the case with direction to respondent to provide the electric connection as applied by the appellant observing the rules in force.

Data

Size 189.48 KB
Downloads 1699
Created 2014-01-24 09:45:21

Download