The consumer paid the penal charges for the UAL availed and continued to pay the penal charges regularly. When the arrear bill issued including the energy charges, dispute- P/ 287/ 2012- Sheeda Dharmasselan-Varkala.

Download 
Download

Originally the penal charges for the UAL connected, contained only penalty on the Fixed charges portion, which was low compared to the energy charges. The consumer used to pay the penal charges for the UAL connected and did not bother either to remove it or regularise it subsequently, but opted to enjoy it knowingly or unknowingly. The consumer was issued an arrear bill including the proportionate energy charges, (which came into effect from 15.6.2007), which is the cause of the dispute because of the huge amount involved.
The consumer enhanced load and the Meter was changed to a CT operated meter but the M F was wrongly entered as 20 instead of 40. An arrear bill issued - Dispute-P/275/2012-Smt. Beena Justin, Thodupuzha.

Download 
Download

The consumer has enhanced her load necessitating a CT operated Meter, with CT’s having the ratio of 200/5A. The respondent fixed the multiplication factor wrongly as 20 instead of 40 by omission. The APTS detected the mistake and the AE issued an arrear bill assessing for the back period which is disputed by the appellant, under Sec. 56(2) of IE Act, 2003.
The LT consumer under TOD meter scheme, with both Contract Demand and Connected load of 116 KVA each, wants to enhance his C/L to 226 KVA keeping the same CD. Dispute-P-307-2012-Sreelakshmy Polymers

Download 
Download

The LT consumer was allowed to enjoy 116 KVA as his Contract Demand (CD) and also his connected load (C/L) under TOD meter scheme. The consumer requested to increase his C/L to 226 KVA keeping his CD as the original value itself. The feeding Transformer was rated 160 KVA and it feeds other consumers also. Hence the KSEB wanted the consumer to pay amount to increase the capacity of the T’rfr to cater 226 KVA. But the consumer disputes as he promise to keep within the CD limit.

Contact Us

KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488

Any Queries?

Send an email to info@keralaeo.org

Do you Know?

Consumers should submit  petitions to CGRF first before appealing Ombudsman.

Visitors Counter

mod_vvisit_counterToday2005
mod_vvisit_counterAll6232883