Orders of Kerala Electricity Ombudsman  in pdf format
Files:
P/031/2024, Fort-In-Infra Developers

Download 
Download

The appellant Shri. Fort- In- Infra Developers Pvt. Ltd, Ravi’s Arcade is an HT consumer of the Licensee with consumer No: LCN5/6302 with connected load 935 Kw and contract Demand 529 KVA. This consumer is under the Electrical Section, Cantonment Kollam, under the Jurisdiction of the Electrical Circle Kollam. This service connection was availed for the shopping mall named as R.P.Mall. When the power connection was obtained the tariff applicable was HT.IV commercial.The KSERC divided the HT.IV commercial in to HT.IV A & HT.IV B during the tariff determination and published the tariff order dated 08/07/2019,which has been published in the Kerala Government Gazette dated 30/09/2019. The regular bills were raised under the tariff LT.IV A. APTS had conducted an Inspection on 16/03/2023 and found that the consumer was billed on wrong tariff. The tariff applicable would have been LT. IV B. The tariff has been changed with retrospective effect from 08/07/2019 onwards. The difference in the tariff has been assessed and worked out to Rs. 12,43,161/- and issued the demand notice to the appellant. The appellant had contented the bill raised by Licensee and filed petition of CGRF. CGRF issued order dated 23/03/2024 stating that the appellant is liable to pay the bill raised by the Licensee. Aggrieved by the decision of the CGRF this petition is filed to this Authority.
P/032/2024, Sri.Naushad. A.R

Download 
Download

The appellant Shri. Noushad A.R is a consumer under Electrical Section, Pothencode with Consumer No: 1145242022766. The power is availed for a shop and the tariff is LT VII A. The bills was regularly paid by the consumer up to March 2023. The terminal of the meter was burned in April 2023 and the final reading of the meter as 21075. A working meter was installed and the readings during 5/2023, 7/2023 and 9/2023 were taken but the bills were not raised in time. The bill for an amount of Rs.78391/was raised on 08/11/2023. The appellant contented, that the reading shown by the meter is abnormally high. The status of the meter was inspected and found to be correct. The appellant approached the CGRF and CGRF issued order on completing the procedure. The CGRF order states that the appellant is liable to pay the current charges as per the bill raised. Aggrieved with the decision of CGRF, this petition is filed to this Authority.
P/033/2024 Shri.Joe Francis

Download 
Download

The appellant Shri. Joe Francis is having a plot of 9 cent land at Parappukkara in Thrissur District. The entire family was residing in Mumbai for several years. During the absent of the property owner and without obtaining the consent, the Licensee had installed a stay wire in side the property. The appellant had constructed a residential building in the property to live in the native place.The stay wire is obstructing the construction of compound wall. The appellant approached the section office of the Licensee for shifting this stay wire. They have demanded Rs. 8433/and subsequently revised to Rs.12,547/- towards the cost of shifting. The petition is filed to CGRF for a favourable order that the stay wire is to be shifted at the cost of the Licensee as the same was placed without the consent.The CGRF issued order on 17/04/2024 stating that the Licensee shall shift the post and stay wire at the cost of the appellant. Aggrieved by the decision of CGRF this appeal petition is filed to this Authority.

Contact Us

KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488

Any Queries?

Send an email to info@keralaeo.org

Do you Know?

Consumers should submit  petitions to CGRF first before appealing Ombudsman.

Visitors Counter

mod_vvisit_counterToday1181
mod_vvisit_counterAll5048361