Downloads
Overview Search Downloads Submit file Up
Category: Orders
Page 6 of 409
Order by: Default | Name | Date | Hits | [Descending]
Orders Files: 1227
Orders of Kerala Electricity Ombudsman  in pdf format
Files:
P/0352023- Sri. Biju Kuriakose

Download 
Download

The appellant shri Biju Kuriakose is a consumer of the licensee under the tariff LT IA with the consumer number: 11573444011859 under Thiruvaniyoor Section. The consumer installed a Solar Plant of 10kw capacity on 13/12/2018. The connected load of the consumer is 29.35 kw. The solar plant is the grid interactive solar system. The meter has been converted CT/PT connected meter as his connected load exceeded 25kw on 18/12/2020. The zone wise reading of the TOD meter started from 7/2022 onwards. On verification of the zone wise reading, it recorded export of energy in the Zone II and Zone III which shows that there is connection error in CT. Accordingly the sub engineers visited the site and found that the secondary terminals of the CT connected wrongly to the meter. As the polarity was reversed the meter recorded export as import and import as export. The connections were rectified and a mahazzar was prepared. A short assessment bill for Rs. 3, 09,269/- was issued to the appellant. The CGRF was approached and CGRF issued order stating that the appellant is liable to pay the short assessment bill with effect from 18/12/2020. Aggrieved by the decision of CGRF, this appeal petition is filed.
P/042/2023- Shri. Muhammed Sheriff

Download 
Download

The appellant availed an electric connection from the licensee (KSEBL) with consumer no. 11567220229617 from the Ollur, Electrical Section under the tariff LT VI A. The connection availed was for an Industrial Establishment with connected load of 83Kw. The meter provided is the CT connected meter with current ratio 150/5 and hence the multiplication factor 30. APTS inspection was conducted on 24/05/2018 and it was found that voltage in one phase of energy meter was missing. A standard reference meter was connected and found that the meter record only 67.56% of the actual reading. When the data was downloaded from the meter it shows that the voltage was missing for 34 times since 7/2017. A site mahazar was prepared in presence of the manager of the appellant and a copy was handed over to them. Accordingly, a short assessment was issued for Rs. 52,500/- on 11/06/2018 for the missing 1/3rd of the consumption for the period of three months from 02/2018 to 04/2018. During the audit of RAO, opined that the short assessment is to be charged for the entire period and an additional bill for Rs. 1,61,556/- was issued on 20/02/2020. Then the appellant submitted the complaint to the Vydhyuthi Adalath, then the amount was revised to Rs. 1,32,127/-. The appellant filed petition to the CGRF (CR), Ernakulam and CGRF issued order dated 18/08/2023. Aggrieved with the order of CGRF, this appeal petition was filed to this authority.
RP/004/2023- Shri. Shaji M

Download 
Download

The appellant is a domestic consumer of the licensee under the section Ramanthali at Payyannur. The complaint was about drawing electrical line and placing the post and stay wire blocking the access to his property from the road. There was a public pathway which has been converted into a tarred road in front of his land at eastern boundary. The appellant requested the officials of the licensee to shift the post and stay wire and they have not agreed to shift the post and line. The appellant filed a civil case in the Munsif Court of Payyannur and is pending for decision. The appellant approached the CGRF and then appealed to this authority. The appeal petition numbered P/10/23 and hearing was conducted on 19-04-2023 and an order issued dated 25/04/2023. The civil case was pending in the court and hence the petition was dismissed as per Section 22(1)(d) of KSERC (CGRF and Electricity Ombudsman) Regulation 2005. Aggrieved by the decision of the Ombudsman in the appeal petition, this review petition is filed to this authority. On verifying the documents submitted and hearing both the petitioner and respondent and also from the analysis as mentioned above, the following decision are hereby taken. 1. This review petition is dismissed. 2. No order on cost.

Contact Us

KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488

Any Queries?

Send an email to info@keralaeo.org

Do you Know?

Consumers should submit  petitions to CGRF first before appealing Ombudsman.

Visitors Counter

mod_vvisit_counterToday239
mod_vvisit_counterAll4683434