Downloads
Overview Search Downloads Submit file Up
Download details
P/051/2023- Shri. Dilok Sherlekar. S
The appellant shri. Dilok Sherlekar is a consumer of the licensee under Girinagar Electrical Section with domestic tariff LT 1A and connected load 1.495 kW. This service connection was given on 27/03/2021. The appellant submitted an application to convert the single phase service connection to 3 phase connection on 26/04/2023 and also to change the tariff. The completion report was given showing the connected load as 5.930 kW. But on inspection it is found that the connected load is 17.106kW. The appellant then changed the water heater to solar and connected load was reduced to 12.606 kW. The appellant was given a demand note to pay Rs. 15,450/- as the charges for the service connection. The officials of the licensee has prepared the estimate as per the cost data approved by the Kerala State Electricity Regulatory Commission. This is the flat rate for the load between 10kW and 25kW. The appellant requested the section office to prepare the estimate as per actuals as the distance between the house and post is very small. The section office was not accepted the plea and hence he filed the petition to the CGRF. CGRF issued the order dated 30/09/2023 stating that the appellant is liable to pay the amount demanded by the licensee. Aggrieved with the decision of CGRF, this appeal petition is filed to this authority. 

Data

Size 188.95 KB
Downloads 252
Created 2023-12-26 07:13:26

Download

Contact Us

KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488

Any Queries?

Send an email to info@keralaeo.org

Do you Know?

Consumers should submit  petitions to CGRF first before appealing Ombudsman.

Visitors Counter

mod_vvisit_counterToday626
mod_vvisit_counterAll4690704