Case filed at Hon: High court. P/206/2011. Divisional Engineer, BSNL, Tvm.
The KSEB’s own inspection reveals that the CT’s Multiplication factor used for billing is higher than the actual. The BSNL requests for Refund with interest for complete back period. The Issue was the deter-mination of the actual wrong billing period. The consumer prefers appeal at Hon: High Court. Hence case not maintainable.