The grievance of the appellant is that the rate of interruption in that area is abnormal and hence, wants remedial measures. The appellant made complaint before various levels of officers of KSEB Ltd. and finally filed petition before CGRF, Southern Region, Kottarakkara. The Forum registered the petition and directing the Licensee to carryout system improvement work further in the Padimon area to reduce interruption. Aggrieved on this, the appellant filed appeal petition. From the findings and conclusions arrived at, it is directed the respondent to take the following actions: - 1. Initiate immediate steps to strengthen the distribution network in the area. 2. Analyze the nature of faults of the Feeder and take remedial action to minimize each one. 3. A better coordination of work shall be done. 4. If the interruption is more with the defects of insulation, take action to replace all in a time-bound manner. 5. Maximum care shall be given to preventive maintenance with notice to the consumers. 6. Expedite the construction of Substation as stated in the hearing. 7. Use insulated cables/wires wherever it can be provided. Having concluded and decided as above, it is ordered accordingly and the Appeal Petition filed by the appellant stands disposed of to the extent ordered.

Data

Size 124.32 KB
Downloads 884
Created 2021-02-05 10:53:22

Download