The appellant is the Principal of Heera College of Engineering and Technology situated at Panavoor, Nedumangad, Thiruvanathapuram. This college in an HT Consumer of the Licensee under Electrical Section Chullimanoor with tariff HT II (B) general. The appellant had defaulted the payment and the total arrear works out to Rs. 13,77,479/- for a period from 12/06/2023 to 11/06/2024. The notice was issued to the consumer as per section 56 (1) of the Electricity Act which leads to disconnection of power. The college and Hostel was taken over by the District administration for running the Covid quarantine centre for a period of 6 months from 18/03/2020. The power charges for this period was not paid by the appelant. This arrear was accumulated and the payments made there after was adjusted as per regulation 133 of the Kerala Electricity Supply Code 2014. The appellant has taken up the matter to the State Government for sanctioning the suitable compensation including the power charges. The appellant had filed the petition to the CGRF and CGRF issued the order 04/06/2024 stating that the appellant is liable to pay the amount. Aggrieved by the decision of CGRF, this appeal petition is filed to this Authority. |
|
Data
|
Size |
113.66 KB |
Downloads |
647 |
Created |
2024-10-03 08:52:14 |
|
|