Downloads
Overview Search Downloads Submit file Up
Category: Orders
Order by: Default | Name | Date | Hits | [Descending]
Orders Files: 1327
Orders of Kerala Electricity Ombudsman  in pdf format
Files:
Unconnected minimum charge demanded from the consumer for the contract demand – P/309/12- Afsal K.I.,Trissur

Download 
Download

The KSEB has demanded unconnected minimum charges from the consumer for the sanctioned contract demand inspite of the availed contract demand. The appellant remitted the UCM charge as demanded by the KSEB. The consumer requested to consider the date of completion of work as the date of energisation approval from the Electrical Inspector and to refund the UCM amount collected with interest.
Supervision charges collected from the appellants by KSEB to provide supply to multi-storied buildings – cases containing similar issues – P/288/12, BinduRia Alex – P/312/12, P/319/12 & P/332/12, Jasmine Rajesh – P/320/12 & P/329/12, Chandra hasanK.C., Tv

Download 
Download

The complete Electrical works of 11 KV cable laying up to consumer premises from the nearby existing distribution system, erection of indoor Transformer and all the allied HT and LT side works and terminal arrangements including LT metering panel in the High rise building were all done by the appellant themselves, after incurring its material and labour costs and paying the Supervision charges to KSEB. The appellants insists that the material cost and some extraneous costs need not be taken for calculating the 10% Supervision charge by KSEB. The appellants also opposes the collection of cost of RMU as it is a part of the Licensee’s distribution system and other sums such as road cutting charges, PTCC approval amount and miscellaneous costs included in the estimate prepared by KSEB.
The licensee has collected OYEC amounts for giving the LT service connections in a High rise building. Whether it is necessary to remit the OYEC charges – P/282/12 & P/303/12 – BinduRia Alex, Tvpm.

Download 
Download

The works of all electrical installations including the 11 KV cable laying up to consumer premises, erection of indoor transformer and allied HT and LT side works and terminal arrangements including metering panel was done by the appellant after paying cost estimate and/or the supervision charges. A number of LT service connections were effected, after collecting the OYEC charges. The appellant requests to refund the OYEC amounts collected with interest, since the collection of OYEC amounts in such cases, were never authorized by any regulations created by the KSERC. Dispute.

Contact Us

KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488

Any Queries?

Send an email to info@keralaeo.org

Do you Know?

Consumers should submit  petitions to CGRF first before appealing Ombudsman.

Visitors Counter

mod_vvisit_counterToday1871
mod_vvisit_counterAll6232749