Hon Court orders to approach the Electrical Inspector to decide on the true average consumption during meter faulty period- failure to act upon it - Dispute- P/193/2010- K P Hashim- Harbour Fisheries, Thoppumpady, Vs KSEB.

Download 
Download

APTS inspection found the CT’s provided to Meter of a Fish Processing Plant as faulty and hence the meter was recording less. A short assessment bill issued to consumer back assessing for a certain period. Consumer disputes the Bill and a Case filed at Hon High court and the court ordered to file the statutory appeal before the Electrical Inspector for decision on the true energy consumption during the meter faulty period-Both sides did not file the appeal as either side thought it as the responsibility of other side.Dispute.
An HT Connection with the ownership and the consumer standing in different Firm’s name, but the Directors of both Partnership firm is one and the same. Dispute over collecting additional Security deposit- M/s Oberon Mall, Ernakulum. P/217/2011-Vs KSEB.

Download 
Download

The ownership of the Building and the consumer, who runs a large Multi-Business Unit and in whose name the electric connection was registered, were in the name of two different Partnership Firms. The KSEB insisted for Letter of consent from the owner and also demanded Additional Security deposit, equivalent to Cash deposit, for giving the connection. The appellant’s claim is that the Partners of both the partnership firm are one and the same and hence there is no need for addl.CD. Request to return the amount collected as Addl CD. Dispute reg:
Criteria for Power intensive category-Foot wear unit having heating load more than 20% of total connected Load -HT consumer with 96 KW heating load out of a CD of 200 KVA - P/180/2010-V P Mustafa, M/s Diadora Shoes Pvt Ltd-Chelambra.

Download 
Download

The HT consumer is running an industrial unit for Foot wear Production. He claims that he was treated as a power intensive unit and he objected the same but was forced to take connection under duress. He request to cancel the Service connection Agreement already executed and pleads for a new Agmt under ‘non-power intensive category’ and also pray to refund the electricity charges paid to KSEB from the date of connection (year 2005). Dispute with KSEB

Contact Us

KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488

Any Queries?

Send an email to info@keralaeo.org

Do you Know?

Consumers should submit  petitions to CGRF first before appealing Ombudsman.

Visitors Counter

mod_vvisit_counterToday2539
mod_vvisit_counterAll6233417