The appellant Shri. Denny Simon is a domestic consumer with Consumer no.1156565001346 and with connected load 8.426 KW. The appellant had applied for solar connection on 02/03/2024 and the solar plant was commissioned on 12/04/2024. When the solar plant was connected the billing pattern has been changed to the monthly billing from the previous bimonthly billing. The date of last reading was 04/04/2024 which was before solar panel connection. The period from 04/04/2024 to 12/04/2024 was the non solar period consumption. The next bill issued on 02/05/2024 in which 04/04/2024 to 12/04/2024 is the non solar period and for the period from 12/04/2024 to 02/05/2024 was the solar period. The bill so issued amounts to Rs. 550.70/- for solar period at Rs. 207.28 for the solar period totaling to Rs.758/-. The reading for a period from 04/04/2024 to 12/04/2024 was 68 units. 68 units were consumed for 8 days then the monthly consumption was arrived and this exceeds 250 units and accordingly the flat rate tariff @ Rs. 6.4/- per unit was applied. The appellant challenged this method of calculation. His argument is the total consumption was only 68 units and the tariff applied should be telescopic tariff applicable to 68 units. The appellant filed the petition to CGRF and CGRF issued order on 03/12/2024.Aggrieved with the order of the CGRF, the appellant had filed this appeal petition to this Authority. |
![]() ![]() |
|
The appellant Shri.C.P Prabhakumar is the owner of the Coastal Breeding Farm (Pvt.) Ltd. at Vannamada, Palakkad with Consumer no. 1165020021296. The said connection was taken as a temporary in LT VII A tariff for the construction purpose with connected load 6.89KW in the name of Mr. Ramakrishnan which was connected on 29/04/2013. Later the connection was changed with the appellant, as 3 phase LT, with connected load 44.459 KW with contract demand of 20 KWA. The tariff applied was changed from LT 7A to LT 4A as per the request of the consumer on 10/01/2014. The appellant was running a duck hatchery and produce day old duckling and selling outside. The certificate issued by the District Industries Centre states that the industry is Hatchery. The Licensee issued by Eruthempathy Panchayath as well as in Kerala State Pollution Control Board also states that the unit is Hatching the Duck egg and produces daily one ducklings. The Licensee had applied the tariff LT IV A, and latter changed into LT V B based on the request of the consumer and conducting inspection on 06/08/2023. The allegation of the appellant is that the Licensee would have applied the tariff since 10/01/2014. Itself, Or would have changed by the Licensee on suo motto as per regulation 97 of the Supply Code, 2014. The appellant had filed the petition to the CGRF and CGRF in order on completing the procedures on 11.11.2024. The Aggrieved the appellant had filed this petition as appeal to the order of CGRF. |
![]() ![]() |
|
The appellant is a company existing in Kanjikode industrial area and represented by its Managing Partner Shri. Asrudeen. The connection with Consumer No. 1165280017556 was effected on 09/11/2012 in the name of K.V Ratheesh, Temco Electricals and Electronic Devices (Pvt.) Ltd.under LT IV tariff with connected load of 41KW. On 16/08/2018 they have applied for the transfer of ownership to the present consumer and the connected enhanced to 89 KW and accordingly these effected in the month of 08/2018. On 02/07/2024 an inspection was conducted by AE, of Electrical section and found that the process what is happening in the factory is not eligible for tariff LT IVA and accordingly the tariff has been changed LT VII A (commercial). As per the proceedings of the General Manager, Palakkad, Industrial Centre, the name of the company has been changed to Swaraj Bio Fuel and business also has been changed to Dehydration and Distillation of the Oil. The Licensee has raised the demand for under changed amount for a period 24 months as per the regulation 134 of the Supply code 2014. The CGRF issued order stating that the Licensee can recover the under changed amount for the whole period. Aggrieved by the order of CGRF this appeal petition is filed to this authority. |
KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488
Send an email to info@keralaeo.org
![]() | Today | 5197 |
![]() | All | 6130389 |
P/07/2025, Sri.P.R.Gireesan |
04-04-2025 |
P/06/2025, Sri. Sajan.Varghese |
04-04-2025 |
P/05/2025, Sri. Ratheesh.N |
04-04-2025 |
P/04/2025,Smt. Sabeena.N |
04-04-2025 |
P/03/2025, Sri,Biju.Tom |
04-04-2025 |
P/02/2025,Sri.Ajayakumar.V,R |
04-04-2025 |
P/01/2025,Sri. Denny Simon |
04-04-2025 |
P/086/2024, Sri.C.P Prabhakumar |
04-04-2025 |
P/084/2024,M/s. Swaraj Bio Fuel Energy |
10-03-2025 |
P/083/2024, Sri. Swapnaraj Ravikumar |
10-03-2025 |