Orders of Kerala Electricity Ombudsman  in pdf format
Files:
NO.P.043/2014 - Shri.Jouhar Ali, Malappuram

Download 
Download

The appellant and his brother Usmankoya have been conducting Kala Furniture and Kala Home appliances as tenants in a building owned by the appellant’s brother Sri.Aboobacker. Consumer numbers 6201 and 3457 relate to Kala Furniture and Kala Home Appliances respectively. At first there were seven connections in the building. But five service connections 3458, 5461, 6285, 6286 and 6287 were dismantled. For regularising the remaining two connections 3457 and 6201 the complainant submitted application on 05.02.2010 and executed two Indemnity Bonds in Form No.5 before the Assistant Engineer, Electrical Section, Kuttippuram after remitting the then existing dues. Thereafter monthly bills were also paid regularly. There were some disputes and litigations between the appellant and the additional respondent before the CDRF, Malappuram and before the Hon’ble High Court of Kerala. As per the orders of the Hon’ble High Court in WP (c) 35132/2010, the respondents were directed to conduct an independent enquiry and to take steps as envisaged by law. The respondents were also directed either to regularise or to disconnect connections 3457 and 6201 as envisaged under law. Finally the KSEBoard Ltd, after conducting an enquiry, passed an order directing to penalize for unauthorised use of electricity and to issue notice for removing unauthorised load connected to 3457 and 6201. It was also directed to regularise the load to these connections and to disconnect the supply to goods lift. Aggrieved by the above order of the KSEBoard Ltd, the appellant approached the CGRF, Kozhikode seeking direction to regularise the supply connection No.3457 and 6201. But the petition was dismissed by the CGRF. Hence, this appeal petition is filed. The demand issued for Rs. 29,700/- and Rs. 59,400/- is quashed. The above amount may be refunded along with interest at any rate before 30 days from the date of receipt of this order. Also directed to reconnect consumer No. 6201. Appeal is allowed. Order of CGRF is modified.
NO. P/407/2013 - M/s.Zahi Rubbers India Ltd., Aluva

Download 
Download

The appellant is a Company manufacturing “pre-curved tread rubber” for the tyre manufacturing industry. In order to meet the power requirements of the new factory, the appellant had applied for power allocation to the tune of 3500 KVA under EHT tariff. The appellant had also constructed a 110 KV Sub Station for this purpose after meeting its entire cost. In addition to the above, the appellant had to construct a Tap line to the above Sub Station for which he had remitted Rs.9,50,000/- , on work deposit basis. The appellant has also remitted Rs.7,10,000/- as 10% of the security deposit. As the tyre industry faced huge recession and there was no adequate demand for the products, the Appellant take a decision not to go ahead with the new factory and intimated the respondent that the service is no longer required and hence submitted a proposal to take over the 110 KV Sub Station on payment of fair compensation. But no decision was taken by the respondent on the above proposal, even though there had been some preliminary studies in this regard. As the proposal was not materialised, appellant requested to refund the security deposit. It is alleged that, instead of refunding the security deposit, the respondent had made an unsustainable demand on the appellant for Rs.1,93,48,875/- towards the Un Connected Minimum Charges. Aggrieved against this, the appellant approached CGRF Central Region. CGRF had issued order No CGRF-CR/Comp.164/12-13/dated 20.07.2013 partly allowing the claim of the appellant. Still Aggrieved, the appellant filed this petition before this Authority. Demand notice issued for Rs. 1,93,48,875/- towards the UCM charges is quashed. Also directed to refund an amount of Rs. 7,10,000/- towards the security deposit remitted by the appellant. Appeal allowed. Order of CGRF set aside.
P/074/2014 - Fr. Sabu Nedunilath, Ernakulam

Download 
Download

The appellant is running a hospital – Kristu Jayanthi Hospital, Perumpilly with consumer No. 16898 under Electrical Section, Njarakkal. On 28-05-2013, a short assessment bill amounting to Rs. 2,20,744.00 was issued to the appellant. Against this, the appellant approached the CGRF challenging the short assessment (bill amounting to Rs. 2,20,744.00). The Forum directed the respondents to revise the short assessment under LT VI B tariff (bill dated: 28-05-2013 amounting to Rs. 2,20,744.00) by limiting the period of assessment for 2 years preceding 28-05-2013 i.e. the date of issuance of the bill. The Forum also held that the reclassification of tariff as LT VIII with effect from 05/2013 was in order. Aggrieved against the said order, this appeal petition was filed. CGRF order upheld. The Petition dismissed.

Contact Us

KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488

Any Queries?

Send an email to info@keralaeo.org

Do you Know?

Consumers should submit  petitions to CGRF first before appealing Ombudsman.

Visitors Counter

mod_vvisit_counterToday113
mod_vvisit_counterAll4874103