P/124/2015 - Sri. Eldo Kuriakose, Muvattupuzha

Download 
Download

The appellant is an agricultural consumer (LT V) with consumer No. 727 under Electrical Section No. 2, Muvattupuzha. On 03-02-2015, the APTS team of KSEB conducted an inspection in the premises of the appellant and it was found some irregularities in the classification of tariff. On 11-02-2015, the appellant was issued with a short assessment bill amounting to Rs. 4,567.00 under LT IV A tariff for the period from 5/2013 to 1/2015. The appellant has filed an appeal before the Assistant Engineer, Electrical Section No. 2. After conducting a hearing, the Assistant Engineer revised the bill amount to Rs. 2,107/- and disposed the petition. Aggrieved by this, the appellant approached the CGRF, Ernakulam by filing a Complaint No. 15/2015-16. The CGRF dismissed the petition vide order dated 27-05-2015 by holding that the short assessment bill is in order. Still aggrieved with the above decisions of CGRF, the appellant has approached this Authority with this appeal petition on 24-06-2015. Short assessment bill issued for Rs. 2,107.00 is set aside. Order of CGRF in OP No. 15/2015-16 dated 27-05-2015 is set aside. Appeal is admitted to the extent as ordered.
P/122/2015 - Captain Suresh K.K., Kozhikode

Download 
Download

The appellant is a three phase consumer having a connected load of 27425 watts with consumer number 21332 under LT 6F tariff within the jurisdiction of Electrical Section, Kovoor. The connection is registered in the name of Sri. Joy Joseph. The APTS team conducted an inspection on 17-5-2014 in the premises of the appellant and found that the meter is faulty. On the basis of site mahazar prepared, a short assessment bill amounting to Rs. 2,74,253.00 was served on the appellant. Aggrieved by this, the appellant approached the CGRF, Kozhikode with a petition which was dismissed due to lack of merits. However, Forum has directed the respondent to allow twelve equal installments to remit the amount by the appellant without interest. Against the above order of the Forum, the appellant filed this appeal before this Authority on 18-6-2015. Respondent is directed to issue revised bill for a period of 6 months as per Regulation 115(9) of Supply Code, 2014 at any rate within a period of 30 days. Appeal is admitted. CGRF Order in OP No. 43/2014-15 dated 29-04-2015 is modified.
P/119/2015 - Sri. Aboobacker M, Kayamkulam, Alappuzha

Download 
Download

The appellant is an industrial consumer bearing consumer no. 14511 with a connected load of 60 kW under Electrical Section, Cheppad. The APTS team inspected the premises of the appellant on 6-4-2011 and it is found that the B phase of the CT operated three phase meter recorded zero voltage resulting the consumption of that phase was not recorded by the meter. Based on the site mahazar prepared by the Sub Engineer a short assessment bill amounting to Rs. 3,15,830/- for the period from 9/2010 to 4/2011 was served on the appellant on 19/05/2011. Aggrieved by this, the appellant had challenged the said assessment in WP (C) No. 14284 of 2011 (1) before the Hon’ble High Court of Kerala. The Hon’ble High Court directed the appellant vide an interim order, to remit Rs. 1,00,000.00 and the appellant remitted accordingly. Thereafter the writ petition was disposed of directing the respondent to issue a calculation statement to the appellant and to hear and to take appropriate decision within one month from the date of receipt of an objection from the appellant. A calculation statement was issued to the appellant and after considering the objection filed by the appellant, a final bill for Rs. 3,15,830.00 issued to him by the respondent. Aggrieved by this, the appellant filed petition before the CGRF seeking to set aside the short assessment bill. The CGRF has dismissed the petition with the following directions. 1. The short assessment bill dated 19-05-2011 for Rs. 3,15,830.00 is in order. 2. The respondents are directed to raise fresh bill for the above amount with interest at bank rate till date, after deducting the amount already paid. The petitioner can avail installment facility as per rules. Challenging the orders of CGRF, the appellant had submitted this Appeal Petition dated 20-05-2015 before this Authority. Respondent is directed to issue revised assessment for the period from 11/2010 to 04/2011 based on the succeeding 3 months consumption after replacing the meter on 12/2012. Appeal is admitted and order of CGRF in OP No. CGRF-CR/Comp/144/2014-15 dated 22-04-2015 is set aside.

Contact Us

KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488

Any Queries?

Send an email to info@keralaeo.org

Do you Know?

Consumers should submit  petitions to CGRF first before appealing Ombudsman.

Visitors Counter

mod_vvisit_counterToday1925
mod_vvisit_counterAll4875915