Downloads
Overview Search Downloads Submit file Up
Category: Orders
Order by: Default | Name | Date | Hits | [Ascending]
Orders Files: 1245
Orders of Kerala Electricity Ombudsman  in pdf format
Files:
P/040/2016 Smt. L. Geetha, Thiruvananthapuram.

Download 
Download

Sri Vijayakumar, Uthram, Palayakavu, Kilimanoor, who was the petitioner in OP No. 9/2016 filed before CGRF (South), Kottarakkara, had requested the respondent to shift an electric post with three stay wires situated in his one cent property either to the border side of his property or along the nearby 33 kV line route. The respondent demanded an estimated amount of Rs. 1,00,778.00 for the above shifting under work deposit scheme. Since the estimated amount is very high the petitioner requested the Forum to shift the line with an alternative method. But the Forum disposed the petition by directing the respondent to shift the post and overhead line to the side of his property within 30 days from the date of receipt of payment of estimated labour charges only. Against the above order of Forum, the respondent approached Hon’ble High Court with WP (C) No. 23420/2016 and the Hon’ble High Court has issued stay order and is kept for pending final orders. The appellant herein, Smt. L. Geetha, is the petitioner in OP No. 27/2016 filed before the CGRF (South), Kottarakkara. The grievance of the appellant is that the respondent took a decision to shift the 11 kV line to her property. Though the appellant raised few arguments against the shifting of line, the Forum has not considered any of those aspects and upheld the decision taken in OP No. 9/2016 and dismissed the petition and directed the respondent to comply with the order in OP No. 9/2016. The appellant’s contention is that the Forum has disposed the petition in OP No. 9/2016 without giving an opportunity of being heard and passed an order directing the respondent to shift the line to the property of the appellant. Aggrieved against the order of the Forum in OP No. 27/2016, the appellant filed this petition. It is also submitted that the petitioner in OP No.9/2016, K. Vijayakumar had purchased one cent of land adjacent to the appellant’s property. The electric line came from the MC Road, Kilimanoor is drawn through the private road of late, Lakshmi Warasiyar. The line was drawn at about 40 years back. The petitioner Sri Vijayakumar purchased the above said land recently. Sri Vijayakumar after purchasing the land, he was taking steps to shift the electric line from the side of his property claiming the above said private road is also a part of his property. Therefore there is a dispute regarding the private road between the petitioner in OP No. 9/2016 and appellant herein and the appellant has also stated that there is a dispute between Sri Vijayakumar and the appellant herein regarding the private road and a suit is pending before the Munsiff Court, Attingal in OS No. 252/2014. The appellant’s contention is that suppressing the material facts and not array the necessary party to the complaint, the petitioner Vijayakumar filed complaint OP. No. 9/2016 before the CGRF, Kottarakkara against the respondent praying to seek direction to shift the 11 kV line from the side of the disputed property. It is submitted that on 11-02-2016, the appellant herein submitted a complaint before the CGRF, Kottarakkara, against the movement of the shifting of the electric line through the property of the appellant. But the complaint was not considered by the CGRF and the same time the Forum passed an order directing the Assistant Executive Engineer, Electrical Sub Division, Kilimanoor to shift the electric line within 30 days. The reliefs sought for by the appellant herein are: I. To set aside the order passed by the CGRF, Kottarakkara in OP No. 27/2016 dated 30-05-2016 II. Direct the respondent not to shift the electric line to the appellant’s property before disposing the OS No. 252/2014 pending before the Munsiff court, Attingal. The respondent has put forward the following contentions in his statement of facts. The appeal petition of the appellant related to the case filed by one Sri Vijayakumar before the CGRF in OP No. 9/2016 and the decision taken by the CGRF vide order dated 11-04-2016. The petitioner in OP No. 9/2016, Sri Vijayakumar has purchased one cent of land from Smt. Jameela Beevi on 28-12-2011. Two 11 kV feeders from Kilimanoor Substation are passing through this property and also placed an A-pole number K/KV-33/1. Sri Vijayakumar has requested to shift the post and the line to the southern side of his own one-cent property. Knowing this fact, the appellant herein, Smt. L. Geetha had made a complaint to the Assistant Engineer, Electrical Section, Kilimanoor not to shift the post and line since either Smt. Shajitha or Sri Vijayakumar has not in possession of any land and the transaction of property was illegal. According to the appellant, the private pathway is exclusively for the use of family members and six other land owners who purchased the land from the family members of the appellant. The appellant and others are against the shifting of the 11 kV post to the boundary of the pathway. Sri Vijayakumar approached the CGRF with a request to shift the post and the CGRF allowed the petition. On getting expert opinion from the legal advisor, KSEB Limited, they filed a Writ Petition against the order issued by CGRF in OP No. 9/2016. Since the Hon’ble High Court of Kerala has stayed the order of CGRF in OP No. 9/2016, the respondent has not complied with the above orders of CGRF. The respondent has requested to take a suitable decision on this appeal in accordance with the circumstances mentioned above. The case was posted for hearing on 27-09-2016 in my chamber at Edappally but the appellant was absent and Sri. Chandran M, Assistant Executive Engineer, Electrical Sub Division, Kilimanoor appeared for the respondent’s side. The respondent stated that that they have filed a Writ Petition, WP(C) 23420/2016(B), before the Hon’ble High Court of Kerala against the CGRF order in OP No. 9/2016, which is stayed by the Hon’ble High Court. In the above circumstances the respondent requested to keep the case pending till the disposal of Hon’ble High Court. The respondent also stated that there is a civil case pending before the Munsiff Court, Attingal regarding the ownership of the property and the pathway. Similarly the Hon’ble High Court of Kerala have also stayed the implementation the CGRF’s order. As per Clause 22 (d) of the Kerala State Electricity Regulatory Commission (CGRF and Electricity Ombudsman) Regulations, 2005, provides that “maintainability of the complaint‐ (1) no representation to the Ombudsman shall lie in case where a representation for the same grievance by the complainant is pending in any proceedings before any Court, tribunal or arbitrator or any other authority or a decree or award or a final order has already been passed by any such Court, tribunal, arbitrator or authority”.   On going through the records it is revealed that a Writ Petition, against the order of the CGRF (South), Kottarakara, is pending before the Hon’ble High Court of Kerala for the same cause of action and related grievances. Also it is noted that a civil case is pending with regard to the ownership of the disputed property. In view of the above discussions I hold that the appeal petition is not maintainable and hence rejected.
P/049/2016 Sri. Joseph Mathew, Thiruvalla, Pathanamthitta.

Download 
Download

The grievance of the appellant is that the officials of licensee has caused damage by way of cutting and removing the trees and plants standing in his property without his consent and also has shifted the overhead line through his property on the request of a third party named Sri. Abraham Mathew. The appellant also alleges that the overhead line was drawn through his property without his consent or knowledge which has caused threat to his safety. Aggrieved against the respondent’s action, the appellant filed a petition before the CGRF, Kottarakkara, which was disposed of vide order OP No. 52/2016 dated 16-06-2016 directing the appellant to remit the labour charges for the shifting work. Not satisfied with the order of the Forum, the appellant preferred this appeal before this Authority. In view of the discussions I don’t find any reasonable justification for charging the appellant for shifting the line by way of insisting payment of estimated cost for the labour portion. Hence the respondent is hereby directed to shift the line to its original position at any rate within 15 days from the date of receipt of this order. The appeal petition is admitted. The order of CGRF in OP No. 52/2016 dated 16-06-2016 is set aside. No order as to costs.
P/052/2016 Sri. Raju M. Varkey, Pathanamthitta

Download 
Download

The service connection with consumer No. 12143, under Electrical Section, Mallappally stands in the name of Sri Raju M. Varkey, the appellant, with a connected load of 10296 Watts under domestic tariff. A short assessment bill for Rs. 9,901.00 was issued to the appellant, reassessing him, for the meter faulty period from 7/2015 to 9/2015 based on an audit report of Regional Audit Officer. Aggrieved against the impugned bill, the appellant filed a complaint before the CGRF, Kottarakkara on 28-03-2016. But the Forum in its order in OP No. 42/2016 dated 30-05-2016 dismissed the petition since the bill issued by the respondent was found in order. Not satisfied with the decision of CGRF, the appellant has submitted this appeal petition before this Authority. In view of the above discussions, there is no justification for issuing a revised bill to the appellant even without conducting any testing of the energy meter. Hence the impugned bill is hereby quashed. The respondent is directed to issue revised bill for the period from 07/2015 to 09/2015 at any rate within 30 days from the date of receipt of this order based on average consumption for the 3 billing cycles after the meter is replaced and the excess amount, if any, shall be adjusted in the future bills. The appeal petition is allowed. The order of CGRF is set aside. No order as to costs.

Contact Us

KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488

Any Queries?

Send an email to info@keralaeo.org

Do you Know?

Consumers should submit  petitions to CGRF first before appealing Ombudsman.

Visitors Counter

mod_vvisit_counterToday326
mod_vvisit_counterAll4879095