P/054/2016 Sri. Arun R. Chandran, Ernakulam

Download 
Download

The appellant represents M/s Indus Towers Ltd., a company providing passive infra structure service to telecommunication providers. The consumer number of the above service connection is 29711 and is under the jurisdiction of Electrical Section, Pathanapuram. The appellant is paying the current charges regularly without any due or delay. But the respondent as per the invoice dated 04-03-2016 directed the appellant to remit an amount of Rs. 57,558.00 towards the short assessment for the period from 11/2011 to 02/2012. An objection against the demand was filed before the Assistant Engineer and the same was rejected without quoting any valid reason or regulations. So the appellant had approached the Hon’ble CGRF (SR) by filing a petition in OP No. 78/2016. The Forum disposed of the petition by ordering to quash the bill and directed to issue the revised bill for two billing cycles. The respondent issued revised bill for Rs. 28,153.00 dated 12-08-2016. Aggrieved against this, the appellant has submitted this appeal petition before this Authority. In view of the above findings the revised short assessment issued to the appellant for Rs. 28,153.00 is quashed. The order of CGRF in OP No. 78/2016 dated 08th August 2016 is set aside. Having concluded and decided as above, it is ordered accordingly. No order as to costs.
P/053/2016 Smt. Vijayalekshmi Amma, Thiruvananthapuram.

Download 
Download

The appellant Smt. Vijayalekshmi Amma is a consumer with consumer No. 10430, under Electrical Section, Parassala. A service wire was drawn by crossing the appellant’s property for giving service connection to her neighbour, Smt. Visalakshi Amma for conducting a flour mill with consumer No. 1128. It is alleged that the service wire was drawn years back without any consent of the appellant. As the appellant wants to do some adjoining construction in the existing building, this service wire becomes a hindrance. So the appellant made a request to shift the service wire through which an overhead line drawn for giving domestic connection to Smt. Visalakshi Amma. The grievance of the appellant is against the inaction on the part of respondent for not shifting the weather proof 3 phase service wire passing through her property. Further, the Assistant Engineer, Parassala demanded an amount of Rs. 16,369.00 from the appellant for carrying out the shifting work. But the appellant raised objection against the demand. According to the appellant the expenses for shifting the service wire shall be borne by the consumer who availed the service connection with consumer No. 1128. So the appellant filed a petition before the CGRF, Kottarakkara, which was disposed of vide order in OP No. 1604/ 2015 dated 21-12-2015, directing the appellant to remit the labour charges for shifting the service wire. Not satisfied with the order of the Forum, the appellant approached this Authority with this appeal. In view of the above discussions, the respondent is directed to prepare a fresh estimate for labour charges for the shifting through the originally proposed route within 2 weeks from the date of receipt of this order and to complete the work without any further delay from the date on which the appellant remits the amount as per revised estimate. It is clarified that the respondent should not insist for further consent from the property owner for the conversion of the line. The order of CGRF in OP No 1604/ 2015 dated 21-12-2015 is upheld. No order as to costs.
P/059/2016 Sri. Arun R Chandran, Ernakulam

Download 
Download

The appellant represents M/s Indus Towers Ltd., a company providing passive infra structure service to telecommunication providers. The consumer number of the above service connection is 7669 and is under the jurisdiction of Electrical Section, Mulamkunnathukavu. At the time of availing service connection by the Cellular Mobile Towers who failed to produce required clearances, was given temporarily under LT III tariff. Challenging the applicability of LT III tariff, most of the Cellular Mobile Tower operators filed Writ Petitions before the Hon’ble High Court. In the meantime, the Hon’ble Kerala State Electricity Regulatory Commission in an order dated 07-01-2010 in TP No. 67/2009 has decided the tariff applicable to Cellular Mobile Towers shall be under LT VII A, even if the connections to the premises were effected on temporary basis due to lack of required clearances. The licensee implemented the orders of Commission and directed to revise the bills issued to Cellular Towers under LT III tariff to LT VII A tariff with effect from 07-01-2010. But the Hon’ble High Court of Kerala in W.P. (C) No. 34101/2010, directed KSEB Limited to make revision of tariff to the Mobile Towers with effect from 24-10-2002 onwards. The appellant was given a short assessment bill amounting to Rs. 7,35,706.00 dated 08-01-2010 towards the difference in LT III and LT VII A tariff for the period from 06/2005 to 7/2009. Against the short assessment bill the appellant approached the Honourable High Court of Kerala and filed a Writ Petition No. 5229 of 2010. The Honourable High Court of Kerala vide its Judgment dated 20-05-2015 directed the appellant to submit detailed objection to the invoices impugned and such objection if filed within one month shall be dealt within 2 months thereafter. Accordingly the Assistant Engineer revised the short assessment bill to Rs. 2,25,668.00 by applying LT III Tariff up to 01-12-2007. Aggrieved by order of the Assistant Engineer the appellant had filed a petition before the Honourable CGRF, Central Region, Ernakulam which was dismissed stating that, since the case is considered by the Honourable High Court, the Forum has no jurisdiction over the issue. Aggrieved against this decision, the appellant has submitted this appeal petition before this Authority. In view of the above findings, the respondent is hereby directed to fix the tariff of the appellant under LT VII A with effect from 24-10-2002 onwards or the actual date on which the service connection effected to the appellant after 24-10-2002 as ordered by the Board dated 28-04-14 and 16-04-2016 and as per the common award passed by the Lok Adalath. Having concluded and decided as above, it is ordered accordingly. The appeal petition No. P/059/2016, filed by the appellant is disposed of as above. The order of CGRF-CR/Comp/30/2016-17/232 dated 17-08-2016 is set aside. No order as to costs.

Contact Us

KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488

Any Queries?

Send an email to info@keralaeo.org

Do you Know?

Consumers should submit  petitions to CGRF first before appealing Ombudsman.

Visitors Counter

mod_vvisit_counterToday328
mod_vvisit_counterAll4879097