Orders of Kerala Electricity Ombudsman  in pdf format
Files:
CLARIFICATION ON THE ORDER NO. P/54/2017 DATED 14-08-2017

Download 
Download

In pursuant to the Order No. P/54/2017/1111 dated 14-08-2017, issued by this Authority, in the Appeal petition No. P/54/2017 stated above, clarification was sought for by the appellant, Sri, Arun Chandran, vide his submission dated 12-10-2017, on the point whether surcharge is payable by him during the dispute pending period since the respondent has directed the appellant to remit an amount of Rs. 36,224/- towards surcharge for the dispute pending period. This point is clarified as follows; In page 12 of the order, under the subhead ‘Decision’, the following sentence is added in the second paragraph. “The appellant shall remit the amount within 15 days from the receipt of the order. No interest is payable by the consumer during the petition pending period before the CGRF and this Authority up to the due date as ordered now. There is no other modification in the said order dated 14-08-2017. Having concluded and decided as above, it is ordered accordingly.
Collection of OYEC charges by KSEB for providing connections to various flats/apartments in a High rise buildings– P/311/2012 and P/321/2012 – Jasmine Rajesh and K.C.Chandrahasan, Tvm.

Download 
Download

The complete electrical works of 11 KV cable laying upto consumer premises from the nearby existing distribution system, erection of indoor transformer and all the allied HT and LT side works and terminal arrangement including LT metering panel in the high rise buildings were all done by the appellants themselves after incurring their material and labour costs and paying the supervision charges to KSEB. The appellants objects the collection of OYEC amounts by KSEB, since no additional work necessitated to give those electric service connections requested by them.
Consumer applies for a 2nd connection to the 1st floor with passage inside the Ground floor connection premise. P/224/2011- G. Sathheesh Kumar-S L Puram.

Download 
Download

The consumer applies for a new connection for his 1st floor of his residential house. No independent passage to the new premises. It can be approached through the inside portion of another consumer (ground floor). KSEB asks for separate entry for each premises for entry. Dispute.

Contact Us

KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488

Any Queries?

Send an email to info@keralaeo.org

Do you Know?

Consumers should submit  petitions to CGRF first before appealing Ombudsman.

Visitors Counter

mod_vvisit_counterToday1216
mod_vvisit_counterAll4705764