Orders of Kerala Electricity Ombudsman  in pdf format
Files:
Conversion of existing electric connection under HT to LT tariff and reduction in connected load – P/244/2011 – Indian Oil Corporation Ltd, Kochi

Download 
Download

The consumer had requested the licensee to convert the HT power connection to LT tariff with a reduced connected load. Later the consumer stopped all their activities in the premises and discontinued paying the electricity charge. The consumer was served with demand notices towards the dues of current charges and interest accrued during the period. Due to failure to remit the bills, the consumer was served with Revenue Recovery notice by Tahasildar (RR). The appellant filed a complaint requesting orders to set aside the impugned assessment dated 15-3-2007 and against the action taken for the revenue recovery. Dispute on the final dues of the consumer.
Corrosion and loose connection in one phase of the Meter not recording consumption. Dispute- P-166-2010- Review Petition- Jose Baby- UTC Ice factory-Neendakkara.

Download 
Download

The APTS inspection revealed that one phase supply to the meter is not recording correctly. The consumer was issued a bill assessing the energy lost on this account. The appellant contest that the Mahazar prepared is at the office and the Meter was not sent for testing and adjudication by the Electrical Inspector and the 3rd member of CGRF has expressed a different note than that expressed by the others of the CGRF etc.
Criteria for Power intensive category-Foot wear unit having heating load more than 20% of total connected Load -HT consumer with 96 KW heating load out of a CD of 200 KVA - P/180/2010-V P Mustafa, M/s Diadora Shoes Pvt Ltd-Chelambra.

Download 
Download

The HT consumer is running an industrial unit for Foot wear Production. He claims that he was treated as a power intensive unit and he objected the same but was forced to take connection under duress. He request to cancel the Service connection Agreement already executed and pleads for a new Agmt under ‘non-power intensive category’ and also pray to refund the electricity charges paid to KSEB from the date of connection (year 2005). Dispute with KSEB

Contact Us

KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488

Any Queries?

Send an email to info@keralaeo.org

Do you Know?

Consumers should submit  petitions to CGRF first before appealing Ombudsman.

Visitors Counter

mod_vvisit_counterToday1176
mod_vvisit_counterAll4705724