Orders of Kerala Electricity Ombudsman  in pdf format
Files:
Split activity of industry at diff:places-Tariff- P/159/2010-Paul Francis-KLF Industry-Kodakara.

Download 
Download

The coconut oil processed at an industrial unit was transported to a different place and the terminal activities of filtration and packaging done at the new unit.Whether the new unit eligible for industrial tariff?
Sluggish working of the Meter.Reassessment-P/172/2011--Krishna Fuel works-Guruvayur

Download 
Download

Petrol Pump. Meter showed a gradual decline over a period of time in energy consumption recordings in the Meter till it is black out.After changing the Meter showed considerable increase in consumption.Consumer billed on new average. Dispute of the Bill
Short assessment bill issued to the consumer based on report of KSEB’s audit wing, during the period of low consumption supposed due to meter faulty - Appeal Petition No. P/212/2011 – Joy Raphel A V, Koovapady, Ernakulam.

Download 
Download

The consumer had a low consumption recorded cases when the CT to the meter was found faulty and KSEB has a case of lower consumption for certain past period, comparing the actual consumption when the CT was repaired or replaced. The consumer challenge the reckoning of the previous period of CT fault for raising the short assessment bill prepared based on the Audit report of KSEB. Dispute over KSEB’s action based on audit report .

Contact Us

KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488

Any Queries?

Send an email to info@keralaeo.org

Do you Know?

Consumers should submit  petitions to CGRF first before appealing Ombudsman.

Visitors Counter

mod_vvisit_counterToday628
mod_vvisit_counterAll4719278