Downloads
Overview Search Downloads Submit file Up
Category: Orders
Order by: Default | Name | Date | Hits | [Descending]
Orders Files: 1265
Orders of Kerala Electricity Ombudsman  in pdf format
Files:
Criteria for Power intensive category-Foot wear unit having heating load more than 20% of total connected Load -HT consumer with 96 KW heating load out of a CD of 200 KVA - P/180/2010-V P Mustafa, M/s Diadora Shoes Pvt Ltd-Chelambra.

Download 
Download

The HT consumer is running an industrial unit for Foot wear Production. He claims that he was treated as a power intensive unit and he objected the same but was forced to take connection under duress. He request to cancel the Service connection Agreement already executed and pleads for a new Agmt under ‘non-power intensive category’ and also pray to refund the electricity charges paid to KSEB from the date of connection (year 2005). Dispute with KSEB
Discrepancies in the billing of Light meter and during Meter faulty period of an Industrial consumer- detected by the audit wing – issuance of a short assessment bill – P/196/2011 – C.P.Varghees, Perumbavoor.

Download 
Download

The consumer is running a rice mill and he was issued a short assessment bill to recover the shortfall in the light meter energy consumption, as it was found working as an additional meter instead as a sub meter to the power meter and also to recover the charges assessed for 3 months, when the meter was malfunctioning due to CT failure, at the rate of additional 2 times the recorded energy consumption, on finding that 2 CT’s have failed.Dispute with KSEB.
Change of tariff of a Milk Processing unit from industry to commercial tariff and issuance of short assessment bill – P/162/2010 – K.C. John, Kozhikode

Download 
Download

Based on an audit report, the tariff of the consumer was changed to commercial rate from the existing industrial one with retrospective effect and a short assessment bill issued. It was found that the consumer’s dairy farm was continuing in LT IV tariff, even after the tariff revision order issued, in which the tariff of milk processing plants, having their freezing, cold storage or chilling load more than 20% of the plant’s total connected load, were to be shifted under commercial from industrial tariff.Dispue with KSEB.

Contact Us

KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488

Any Queries?

Send an email to info@keralaeo.org

Do you Know?

Consumers should submit  petitions to CGRF first before appealing Ombudsman.

Visitors Counter

mod_vvisit_counterToday2896
mod_vvisit_counterAll5046094