Downloads
Overview Search Downloads Submit file Up
Category: Orders
Order by: Default | Name | Date | Hits | [Descending]
Orders Files: 1255
Orders of Kerala Electricity Ombudsman  in pdf format
Files:
P/004/2019 M/S Reliance Jio Infocom Ltd Ernakulam

Download 
Download

The appellant is a telecom service provider and an applicant under the jurisdiction of Electrical Section, Pookottttumpadam, for a new service connection to the mobile tower constructed on the land leased from the owner of the property. The applicant was denied connection since he failed to submit a No Objection Certificate from the Amarambalam Grama Panchayath. Aggrieved by this, the appellant had approached the CGRF (NR) by filing a petition in OP No. 94/2018-19 and the Forum dismissed the petition by upholding the decision of the respondent, vide order dated 30-11-2018. Aggrieved against this, the appellant has submitted this appeal petition before this Authority. From the analysis done above and the conclusions arrived at, the appellant’s plea to effect electricity connection is rejected and this Authority upheld the decision taken by the CGRF in OP No.94/2018-19 dated 30-11-2018. The appeal is found devoid of any merits and hence dismissed. Having concluded and decided as above, it is ordered accordingly. No order on costs
P/089/2018 Smt. Shanima Ishak, Kollam

Download 
Download

The appellant is the Managing partner of the M.G. Roller Flour Mill, an SSI Unit conducting flour making unit. The appellant is an HT consumer under Electrical Section, Thevalakara bearing customer No. LCN 16/7603 under HT 1(A) Industrial tariff with registered contract demand of 175 kVA. The inspecting authorities of TMR Thirumala conducted a field inspection in the Appellant's premises on 02.08.2017 and found that the PT Secondary RY and BY Voltages are low and hence the PT unit was suspected to be faulty. The Deputy Chief Engineer Electrical Circle Kollam has directed the Appellant to enhance the contract demand and to replace the PT unit with new PT of accuracy class 0.2 and to change CT with ratio 10/5 A to 15/5 A with accuracy Class 0.2S. The respondent has imposed penalty as 50% extra over the prevailing rate applicable both demand and energy for two months during which the complainant failed to replace the faulty metering component, and one month thereafter. The appellant has challenged the bill and filed an appeal before Consumer Grievance Redressal Forum Vydhyuthi Bhavanam, Kottarakkara as O.P. No. 94/2018. The CGRF, Kottarakkara, dismissed the petition vide order No.94/2018 dated 05-11-2018. Aggrieved by the order of the CGRF, the appellant has submitted this appeal petition before this Forum. From the analysis done above and the conclusions arrived at, I take the following decision. As the appellant produced the newly procured CT and PT units before the KSEBL within the prescribed time limit, there is no need to impose 50% extra as penalty. As such the 50% extra imposed for three months over the prevailing rate applicable both demand and energy charge is quashed. The respondent has also failed to take proper action as specified in the Kerala Electricity Supply Code, 2014, Regulations 174 and 175, by which it was required to issue notice detailing the time limit etc for replacement and a proper service of the notice. Having concluded and decided as above, it is ordered accordingly. The Appeal Petition filed by the appellant is found having some merits and is allowed. The order of CGRF, Kottarakkara in Petition No. OP/94/2018 dated 05-11-2018 is set aside. No order on Costs.
P/003/2019 M/S Reliance Jio Infocom Ltd. Ernakulam

Download 
Download

The appellant is a telecom service provider and an applicant under the jurisdiction of Electrical Section, Pulamanthole, for a new service connection to the mobile tower constructed on the land leased from the owner of the property. The applicant was denied connection since he failed to submit a No Objection Certificate from the Elamkulam Grama Panchayath. Aggrieved by this, the appellant had approached the CGRF (NR) by filing a petition in OP No. 95/2018-19 and the Forum dismissed the petition by upholding the decision of the respondent, vide order dated 30-11-2018. Aggrieved against this, the appellant has submitted this appeal petition before this Authority. From the analysis done above and the conclusions arrived at, the appellant’s plea to effect electricity connection is rejected and this Authority upheld the decision taken by the CGRF in OP No.95/2018-19 dated 30-11-2018. The appeal is found devoid of any merits and hence dismissed. Having concluded and decided as above, it is ordered accordingly. No order on costs.

Contact Us

KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488

Any Queries?

Send an email to info@keralaeo.org

Do you Know?

Consumers should submit  petitions to CGRF first before appealing Ombudsman.

Visitors Counter

mod_vvisit_counterToday435
mod_vvisit_counterAll5032788