The grievance of the appellant is regarding shifting of a High Tension (HT) line passing over the property of the appellant. The appellant requested the Officers of the Licensee, KSEB Ltd., for the shifting of the line, but finally approached CGRF, Central Region and Forum in its order issued the following :- “(1) The respondent shall furnish the detailed cost for shifting the line as suggested by the petitioner along with details of consents required for the line shifting. On satisfying these demands by the petitioner, the respondent shall arrange the shifting work immediately.” The appellant filed the appeal petition before this Authority. The 11 kV overhead single circuit line passing through the road side and in front of the house of the appellant is not a service connection line, but the line is intended to supply power to various number of consumers. This Authority suggested three proposals for deviating a portion of 11 kV line from the property of the appellant: - (1) The respondent shall look into the possibility of some modifications on the electric poles situated on either side of the disputed portion of the line (Pole No. K/KE/133 and K/KE/134) or inserting an electric pole along the line without creating inconvenience to the appellant or to the road users. If it is feasible, the entire expense for the work as above including material cost and labour charge shall be met by the Licensee. (2) The respondent shall look into the feasibility of converting the Low Tension (LT) line from K/KE/132 to ‘C1’ in the Northern side of the road to 11 kV by shifting the 11 kV electric pole K/KE/133 in the location ‘C’ in the Southern side of the road to ‘C1’ or a convenient location on the Northern side of the road and constructing 11 kV overhead single circuit line from ‘C1’ to pole No: K/KE/134 situated in the location ‘B’ on the Southern side of the road. In brief, the new route of the 11 kV line will be ‘A-B-C1-D’, as per the sketch submitted by the respondent. The appellant shall remit the cost of additional materials required, if any, and the labour charge for the rerouting of the 11 kV line, if the shifting is technically feasible. (3) The respondent shall also look into the technical feasibility of shifting the entire portion of the 11 kV line position ‘A-B-C-D’, in front of the appellant to ‘A-B1-C1-D’ to the Northern side of the road. The appellant shall meet the entire cost of shifting the line towards material, labour etc., if the above proposal is technically feasible. The respondent shall select a technically feasible proposal from the above and intimate the appellant within 30 days from the date of order. The order of CGRF, Central Region in OP No: 81/2020-21 dated 30-03-2021 is modified to this extent.

Data

Size 137.76 KB
Downloads 718
Created 2021-11-11 03:27:57

Download

Contact Us

KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488

Any Queries?

Send an email to info@keralaeo.org

Do you Know?

Consumers should submit  petitions to CGRF first before appealing Ombudsman.

Visitors Counter

mod_vvisit_counterToday1225
mod_vvisit_counterAll4872544