The appellant is the owner of a High Rise building having a HT electric connection with a contract demand of 70 KVA. The connection was given after installing a 150 KVA indoor transformer. Seven numbers of other LT connections were also given to the said building (from KSEB T’rfr) on the basis of the applications of the owner/rent holders or occupants prior to HT service with in a total of 50 KVA. While so, the appellant had applied for additional load for a LT connection. Since the total load of all the LT connections so availed in the building including the additional load requested) exceeds 50 KVA, the appellant was asked to install a separate transformer in his building premises, by the KSEB. Hence this dispute. |
|
|||||||||||
KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488
Send an email to info@keralaeo.org
![]() | Today | 4014 |
![]() | All | 7049239 |
P/042/2025, Dr.Thembamoodu Sahadevan |
01-09-2025 |
RP/05/2025, The Assistant Executive Engineer |
01-09-2025 |
RP/04/2025,The Assistant Executive Engineer |
01-09-2025 |
P/041/2025, Sri.Vinod S Panicker |
01-09-2025 |
P/040/2025, Smt. Simi Shaji Panicker |
01-09-2025 |
P/039/2025, Sri. Biju Itty & Smt. Jessy Biju |
05-08-2025 |
P/038/2025, Sri.P.K Gopinathan |
05-08-2025 |
P/035/2025, Sri.Tony Thomas |
05-08-2025 |
P/037/2025, T.Surendran |
05-08-2025 |
P/034/2025, The President, Lions Club Muvattupuzha |
05-08-2025 |