Additional load – request for additional load in a High rise building – P/209/2011 – Mohammed Haji, Kozhikode
The appellant is the owner of a High Rise building having a HT electric connection with a contract demand of 70 KVA. The connection was given after installing a 150 KVA indoor transformer. Seven numbers of other LT connections were also given to the said building (from KSEB T’rfr) on the basis of the applications of the owner/rent holders or occupants prior to HT service with in a total of 50 KVA. While so, the appellant had applied for additional load for a LT connection. Since the total load of all the LT connections so availed in the building including the additional load requested) exceeds 50 KVA, the appellant was asked to install a separate transformer in his building premises, by the KSEB. Hence this dispute.

Data

Size 193.46 KB
Downloads 1986
Created 2012-10-09 09:58:07

Download

Contact Us

KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488

Any Queries?

Send an email to info@keralaeo.org

Do you Know?

Consumers should submit  petitions to CGRF first before appealing Ombudsman.

Visitors Counter

mod_vvisit_counterToday3164
mod_vvisit_counterAll5490233