Downloads
Overview Search Downloads Submit file Up
Download details
The consumer demands the ownership of the service line constructed and the Cable laid on collecting the estimated cost from him. The same Cable used for providing power to the near by applicant at reduced estimate cost is the cause of dispute. Case No. P/
The consumer has remitted the estimated amount for constructing a separate feeder from the Sub-station by laying 3 x 300 sq.mm cable and accessories for meeting a power demand of around 3000 KVA, to his Multi storied Flat complex under OYEC scheme. The dispute arose when KSEB accorded sanction to a 2nd applicant for giving power from the same Cable laid for the appellant. After giving power to the appellant, the Cable had surplus capacity and the next applicant, with a Power demand for above 1000 KVA, was required to pay less, for tapping power from the cable. The 2nd entrant was thus benefitted. The appellant argues that he needs power for his second stage expansion project. The consumer demands the ownership of the service line constructed and the Cable laid on collecting the estimated cost from him under OYEC scheme.

Data

Size 76.28 KB
Downloads 1669
Created 2012-11-28 05:47:03

Download

Contact Us

KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488

Any Queries?

Send an email to info@keralaeo.org

Do you Know?

Consumers should submit  petitions to CGRF first before appealing Ombudsman.

Visitors Counter

mod_vvisit_counterToday812
mod_vvisit_counterAll4872131