The complete Electrical works of 11 KV cable laying up to consumer premises from the nearby existing distribution system, erection of indoor Transformer and all the allied HT and LT side works and terminal arrangements including LT metering panel in the High rise building were all done by the appellant themselves, after incurring its material and labour costs and paying the Supervision charges to KSEB. The appellants insists that the material cost and some extraneous costs need not be taken for calculating the 10% Supervision charge by KSEB. The appellants also opposes the collection of cost of RMU as it is a part of the Licensee’s distribution system and other sums such as road cutting charges, PTCC approval amount and miscellaneous costs included in the estimate prepared by KSEB. |
|
|||||||||||
KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488
Send an email to info@keralaeo.org
![]() | Today | 5159 |
![]() | All | 6145631 |
P/07/2025, Sri.P.R.Gireesan |
04-04-2025 |
P/06/2025, Sri. Sajan.Varghese |
04-04-2025 |
P/05/2025, Sri. Ratheesh.N |
04-04-2025 |
P/04/2025,Smt. Sabeena.N |
04-04-2025 |
P/03/2025, Sri,Biju.Tom |
04-04-2025 |
P/02/2025,Sri.Ajayakumar.V,R |
04-04-2025 |
P/01/2025,Sri. Denny Simon |
04-04-2025 |
P/086/2024, Sri.C.P Prabhakumar |
04-04-2025 |
P/084/2024,M/s. Swaraj Bio Fuel Energy |
10-03-2025 |
P/083/2024, Sri. Swapnaraj Ravikumar |
10-03-2025 |