| On 23.03.2017, the Anti Power Theft Squad of Kottayam unit and officials of Electrical Section Meenadam jointly inspected the premises of the appellant and detected that the B-phase meter was not recorded in the CT operated energy meter due to missing of contact consequent to accumulation of rubber dust on one of the CT secondary terminals (B- phase). A site mahazar was prepared, a short assessment bill amounting to Rs. 3,01,177/- was issued for a period from 02/2016 to 03/2017 for the portion of the energy consumed. decide to quash the short assessment bill amounting to Rs. 3,01,177/- issued to the appellant. The respondent is directed to revise the bill for the consumption for the period of 6 months prior to the inspection dated 23-03-2017. |
|
|||||||||||
KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488
Send an email to info@keralaeo.org
![]() | Today | 7864 |
![]() | All | 7391103 |
| P/045/2025, M/s. Nano Plast |
| 06-10-2025 |
| P/049/2025, Sri. Shaji.T |
| 06-10-2025 |
| P/047/2025, Sri. Sudheer Kumar P.K |
| 06-10-2025 |
| P/048/2025, Sri. Sujithchandran |
| 06-10-2025 |
| P/046/2025, Sri. Baby Paul |
| 06-10-2025 |
| P/044/2025, Sri. Anurag Sharma |
| 06-10-2025 |
| P/043/2025, Sri.Sajikumar. M.B |
| 06-10-2025 |
| P/042/2025, Dr.Thembamoodu Sahadevan |
| 01-09-2025 |
| RP/05/2025, The Assistant Executive Engineer |
| 01-09-2025 |
| RP/04/2025,The Assistant Executive Engineer |
| 01-09-2025 |