The appellant is a domestic consumer with consumer no. 19913 under Electrical Section, Beypore. The appellant alleges that the respondent had given service connection to a consumer by name Kozhikkal Thilakan from the LT line passing through the pathway owned by the appellant and her brother, without their consent. This electric connection was given from electric Post No. CE 30/3 standing in the pathway. Though the appellant raised objection against giving connection from this post, that was not considered by the respondent and effected the service. Aggrieved by this, the appellant approached the CGRF, Kozhikode with a petition in OP No. 70/2014-15 which was dismissed on 3-3-2015 holding that the petition is frivolous and hence untenable in the eye of the law. Not satisfied with the above order, the appellant filed this appeal petition before this Authority on 14-03-2015. The respondent is directed to take up the matter before the Additional District Magistrate for further instructions within a period of 15 days from the date of receipt of this order. CGRF order set aside. |
![]() ![]() |
|
The appellant Sri Abdul Azeez P.T. is a consumer under Electrical Section, Mavoor with consumer No. 5603. The appellant owned a building having 3 shop rooms at Mavoor, Parammal which is located three meter away from Mavoor-Kozhikode main road. The appellant alleged that the proposed transformer to be shifted is situated at about 100 metres away from his premises. The proposed location is in front of the appellant’s shops thereby obstructing the way to the stair case of his building. The appellant approached the CGRF with a complaint seeking immediate steps to prevent the shifting of transformer by the respondent so as to avoid further hindrance to appellant’s buildings. But the Forum found that the structure for installing the transformer has been erected in such a way that there was no obstruction to movement of men and material and general public thus ratifying the action of the respondent. Against the order of the Forum, the appellant filed this petition before this Authority. The respondent is directed to shift the location of the transformer as suggested by the Enquiry Officer and to install a new transformer. Appeal is admitted. CGRF order set aside. |
![]() ![]() |
|
The appellant, Sri Jabir Ali P.K. is a consumer with consumer No. 21066 under Electrical Section, Mavoor and is residing at Parammal. It is alleged that the transformer situated at about 100 metres away from the premises of the appellant is proposed to shift to the entrance of his property thereby making obstruction to his way. Hence the appellant approached the CGRF with a complaint seeking an order to prevent the shifting of transformer by the respondent. But the Forum found that the DP structure erected for installing the transformer has been completed in such a way that there is no obstruction to movement of men and material and general public thus ratifying the action of the respondent. Against the order of the Forum, the appellant filed this appeal petition before this Authority. The respondent is directed to shift the location as suggested by the Enquiry Officer and to install a new transformer. Appeal is admitted. CGRF order set aside. |
KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488
Send an email to info@keralaeo.org
![]() | Today | 852 |
![]() | All | 6254383 |
P/021/2025, Smt. Daisamma George |
02-05-2025 |
P014/2025, Smt. Chitra Nair |
02-05-2025 |
P/013/2025, Sri.Sabu Johny |
02-05-2025 |
P/012/2025,Sri.Mohammed Ibrahim |
02-05-2025 |
P/011/2025, Sri.Satheesh Kumar |
02-05-2025 |
P/010/2025, Sri. Satheesh Kumar |
02-05-2025 |
P/09/2025, Sri.B.R.Ajith |
02-05-2025 |
P/08/2025, Sri.Mohammed Kabeer |
02-05-2025 |
P/07/2025, Sri.P.R.Gireesan |
04-04-2025 |
P/06/2025, Sri. Sajan.Varghese |
04-04-2025 |